Organize the accepted renovation scope into phased visual views that show what changes when, what remains in use, and which client constraints shape the sequence.

The actual workflow — connected nodes you can run to preview each step.
Professional capabilities powered by AI.

Explain which areas remain operational and how the proposed sequence limits disruption.

Show dependencies between retained elements, removals, temporary conditions, and later installation.

Give different participants a visual sequence for reviewing what is included in each phase.
Phasing depends on what must remain accessible, protected, or operational between stages. Include those temporary conditions instead of presenting each phase as an isolated finished image.
Connect every visual change to an item in the scope register. This helps prevent attractive additions from appearing in the image without a corresponding approved scope decision.
The package supports communication, not construction sequencing certification. Verify safety, access, temporary works, services, cost, duration, logistics, and contractor methodology separately.
Turn the scope register and project constraints into phase views that different stakeholders can discuss together.